PROJECT DESCRIPTIONS
Each project bring different challenges. This is another complicated project required 5 project management principles (PMP)
- Address important questions at the beginning of the project.
- Sketch out a scope and goals for your project.
- Communicate roles, expectations, and our objectives as a team.
- Monitor progress and identify roadblocks.
- Making sure all deliverables have been met and finalize the project timeline and budget. (contingency)
Conversion of an existing house to an L-shape opened plan luxurious and spacious extension, with various updates to the property we were able to take an advantage in demonstrating our ability to deliver exceptional results while enhancing both the aesthetics and functionality of the property.
The construction process began with a simple trench foundation detail, as approved in the original drawings, however this was not the best option as we discovered there are 3 active and inactive Manholes. Although approval were granted for double sealed by Thames-water and the Local Council but we’ll never build on Manhole regardless the condition for obvious reason. Therefore we had to go back to the drawing board. New plan means endless telephone calls and email exchange with all parties involved whilst preparing drawing updates and ensured all gel together swift without delay on project progress. Eventually we closed all 3 Manholes completely and sealed channel using earth elements. Then established new channels to accommodate new Manholes and construction. This was done successfully only then we were happy to proceed with foundation, even so we had to settle for a raft foundation design option (each project bring different challenges).
Expertly laid external brickworks to match the existing structure, ensuring a seamless and cohesive appearance. Repeated same principle during construction of brick wall fencing.
All Our team installed insulation to optimise energy efficiency and fitted lintel for added support and stability. We also replaced the door, enhancing the property’s overall design and security. Installed drainage channel and water pipes, ensuring a long-lasting and efficient solution for the property waste management. Our team then focused on the interior, updating the flooring throughout the home with durable and visually appealing materials.
Spotlights were installed to create a warm and inviting atmosphere. Our team also took care of the underlayment and floor screeding, ensuring a solid foundation for the new flooring.
As a finishing touch, we installed skirting boards and other details, bringing a sense of unity and polished to the space.
Extension built with a large French door access with large window profile complementing the surrounding whilst enabling free flow of air and natural sunlight.